My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN OCT 04 I19
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 October 4 Agenda Packet
>
1994 AGN OCT 04 I19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 5:05:01 PM
Creation date
2/20/2014 7:36:36 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />5.6 Edison -Financed Monthly Rate: The monthly rate <br />applicable to Added Facilities -as specified in the <br />Partial Requirements Rate Schedule R-6.0.1, which <br />is currently 1.6 percent. <br />5.7 FERC: Federal Energy Regulatory Commission, or its <br />regulatory successor. <br />5.8 Income Tax Component of Contribution (ITCC): The <br />amount paid to Edison by Colton to cover Edison's <br />estimated liability for Federal Income Tax <br />resulting from One -Time Collectible Cost. <br />5.9 Monthly Chard: The charge to Colton to recover <br />the revenue requirement for Added Facilities <br />payable monthly to Edison and equal to the product <br />of: (1) the actual recorded Added Facilities <br />investment as determined by Edison, and (2) the <br />Edison -Financed Monthly Rate. <br />5.10 One -Time Collectible Cost: The initial sum of <br />$17,000 representing Edison's estimated cost for <br />relocation work and design review which is subject <br />to change in accordance with section 8.5. <br />5.11 Services: The design, engineering, procurement, <br />construction, installation, ownership, operation <br />and maintenance of the Added Facilities. <br />SCE 26-395 R E V 11/90 <br />-4- <br />eI Printed on recycled paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.