My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN OCT 04 I19
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 October 4 Agenda Packet
>
1994 AGN OCT 04 I19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 5:05:01 PM
Creation date
2/20/2014 7:36:36 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />2-4 <br />25 <br />26 <br />6. ADDED FACILITIE <br />6.1 <br />Edison shall design, engineer,- procure, construct, <br />install, own, operate, and maintain the Added <br />Facilities within the Colton Substation. <br />6.2 <br />Edison shall commence performance of the Services <br />upon the later of (i) effective date of this <br />Agreement pursuant to Section 4.1, or (ii) payment <br />by Colton to Edison as required by Section 8.2. <br />Edison shall use reasonable efforts to complete the <br />installation of the Added Facilities by , <br />19 However, Edison shall not be liable for any <br />cost or damage incurred by Colton because of any <br />delay in the completion of the installation of the <br />Added Facilities. <br />7. METERING <br />FOR INTEGRATED OPERATIONS: <br />7.1 <br />For accounting, billing, and metering capacity and <br />energy in accordance with the 1990 IOA and the <br />Partial Requirement Rate Schedule R-6.01, Edison <br />shall install metering equipment located at <br />Edison's Colton Substation as part of Added <br />Facilities. <br />8. CHARGES <br />8.1 Colton shall pay to Edison all costs incurred by <br />Edison for designing, engineering, procuring, <br />constructing, installing, owning, operating, and <br />maintaining the Added Facilities. Such costs are <br />SCE 26-395 R E V 11/90 <br />-5- <br />%0 Printed on recycled paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.