Laserfiche WebLink
C. Each bidder shall visit the proposed work site to fully acquaint himself with the conditions <br />and possible difficulties associated with the performance of the contract. The Contractors <br />shall be held responsible for carefully reviewing all work sites <br />D. No additional compensation or relief from any obligations of the contract will be granted <br />because of lack of knowledge of the site or conditions under which the work will be <br />accomplished. <br />E. Contractor will be required to meet with the City's representative at scheduled times to <br />review work, and to receive special instruction, and to discuss any problems encountered <br />on the job. <br />F. Contractor must able to respond on an emergency call out within 24 hours. <br />G. Contractor shall be knowledgeable of matters pertaining to tree trimming services. The <br />vendor must have a minimum of five (5) years experience in providing quality utility line <br />clearance tree trimming services. <br />REMOVING OBSTRUCTIONS AND MAINTENANCE OF EXISTING IMPROVEMENTS <br />A. When the work hereunder involves performance upon City property, and when the proper <br />completion of the said work requires their temporary or permanent removal, the <br />Contractors shall, at their own expense, remove, and without unreasonable delay <br />temporarily or permanently replace or relocate to the satisfaction ofthe City and of another <br />person or agency having jurisdiction, all water pipes, gas pipes, drainage lines, irrigation <br />lines, sewer lines, pipelines, conduits, culverts, roads, driveways, fences, bridges, railroad <br />tracks, wires, poles, towers, retaining walls, buildings, curbs, gutters, concrete walks, <br />trees, shrubs, lawns, and all other improvements of whatsoever character not required <br />by law to be removed by the City thereof; and all such improvements temporarily <br />removed shall be maintained until permanently replaced, all at the Contractor's expense. <br />B. Where the work is to be constructed in, or adjacent to, areas which have been improved <br />by lawns, trees, shrubs, or gardens, the Contractors shall remove such trees or plants as <br />may be necessary for the prosecution of the work and give them proper care and <br />attention until the work has been satisfactorily completed, after which the Contractors <br />shall replace them in as nearly the original condition and location as is reasonably <br />possible. Where it is necessary to deposit the excavated materials on lawns during the <br />process of construction, the Contractors shall first lay burlap or canvas on the lawn to <br />prevent contact between the excavated material and the lawn. <br />C. Unless otherwise indicated in the contract documents all utility lines, conduits, wires, <br />or structures shall be maintained by the Contractors and shall not be disturbed, <br />disconnected, or damaged by them during the progress of the work, provided, that should <br />the Contractors in the performance of the work disturb, disconnect, or damage any of the <br />above, all expense, arising from such disturbance, or in the replacement or repair thereof, <br />shall be borne by the Contractors. However, in accordance with Section 4215 of the <br />California Government Code, the Contractors shall be compensated for the cost of locating <br />AGREEMENT <br />20 <br />(BB&K: 1-14) <br />23152.08600\1329338.8 <br />01/16/2018 - Council Agenda 151 <br />